Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Feb 13, 2023     Elevator dimpling; HS cap plugs and filler; Empeggange fairing - (1.9 hours)       Category: Tail Feathers
1. Used a "nail dimpler" set to dimple the two remaining cap-attach holes on the trailing edge of the L elevator.

2. Lightly sanded the plugs on the HS caps. (These will get a final, sandable coating of micro shortly.)

3. Cut out and sanded some foam plugs for the horizontal stabs themselves, just adjacent to the cap plugs.

4. Prepped the ends of the HSs.

5. Mixed up some thick flox and bonded the plugs in place in the HSs.

6. Began the process of making my own empennage fairings by cutting up some florist's foam and inserting it into the space above the fuselage aft deck.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.